EnvironmentalIntermediateMaine Exam

Maine's 'Alteration of Terrain' permit may be required for development projects that disturb more than:

A1,000 square feet of land, under standard practice
B1 acre of land (or less under certain conditions)Correct
C5 acres of land
D10 acres of land

Why 1 acre of land (or less under certain conditions) Is Correct

Answer B: 1 acre of land (or less under certain conditions)

Maine's Alteration of Terrain (AoT) permit from the DEP is typically required for development that disturbs more than 1 acre of land, or smaller areas in sensitive locations, to control erosion and stormwater.

Exam Tip: Environmental

Environmental questions test knowledge of hazards like asbestos, lead-based paint, radon, and mold. Know the disclosure requirements and when a professional inspection is required. CERCLA liability is strict, joint, and several.