Vermont's wastewater system permit (Act 250 criterion 1B) requires that a proposed development have:

AConnection to a municipal sewer system only
BAn approved wastewater disposal system with adequate capacity and a potable water supply✓ Correct
CA minimum lot size of 10 acres for any septic system
DState-funded water and sewer infrastructure

Explanation

Act 250 criterion 1B requires that a development have an approved wastewater disposal system (septic or sewer) with adequate capacity and an adequate potable water supply, ensuring basic health and sanitation standards are met.